Before we down tools for Christmas we wanted to have the building weather tight. To this end, this month we have built the gable ends. Installed the roof and fitted the windows and doors.
We have also laid the underfloor heating (Image below) and the screed is being poured today
At the start of January we will start the insulation, begin the wiring of electrics, the plumbing and plastering, followed by the main fixtures. The projected hand over date in April and we are on track to deliver the home on or before that date.